Hello, Guest!

Latest Federal & Government Contracting Companies' News Coverage

Latest Federal & Government Contracting Companies' News Coverage

Advanced Search
Showing 1-12 of 47
Leonardo DRS has manufactured and delivered to General Electric a gas turbine package built for an Arleigh Burke-class guided missile destroyer of the U.S. Navy. The GE-designed LM2500 platform is intended for installation on the USS Louis H. Wilson Jr. (DDG 126), Leonardo DRS said Monday. Jamie McMullin, senior director of naval power systems group at Leonardo DRS, said the delivery […] More
Lockheed Martin is modernizing littoral combat ships of the U.S. Navy, National Defense Magazine reported Friday. Joe DePietro, vice president of small combatants and ship systems at Lockheed, said Thursday prior to the commissioning of the USS Sioux City on Monday, that the LCS modernization seeks to increase the ships’ firepower and survivability. The program involves equipping the […] More
General Dynamics‘ Bath Iron Works subsidiary has begun construction of DDG 127, the future Arleigh Burke-class guided missile destroyer to be named USS Patrick Gallagher. The ship, BIW’s final destroyer in Flight IIA configuration, will feature Baseline 9 of the AEGIS Combat System designed for integrated air and missile defense, the Naval Sea Systems command […] More
Lockheed Martin looks to develop a new propulsion system that is different from the one used in littoral combat ships for the company’s guided-missile frigate offering to the U.S. Navy, Defense News reported Tuesday. The report said Lockheed is examining combined diesel and gas or combined diesel and diesel engine designs in a bid to address the […] More
General Dynamics‘ Bath Iron Works subsidiary will provide integrated planning yard services for the U.S. Navy‘s DDG-51 destroyer and FFG-7 frigate under a potential $87.2 million contract. Work covers design, material and planning support to facilitate the guided missile ships’ maintenance and modernization, the Defense Department said Wednesday. The Navy will obligate $5.3 million in fiscal year […] More
General Dynamics‘ Bath Iron Works subsidiary commenced the construction of a new Arleigh Burke-class destroyer on May 17 in Bath, Maine. The start of DDG 124 or the future USS Harvey C. Barnum Jr.‘s construction is marked by the cutting of the ship’s first 100 tons and a commemorative ceremony,  the U.S. Navy said Thursday. The destroyer takes the name of retired […] More
General Dynamics‘ Bath Iron Works subsidiary has laid the keel on the U.S. Navy‘s future Arleigh Burke-class destroyer ship that will be called USS Daniel Inouye. The ship, designated as DDG 118, is named after the former senator who earned a Medal of Honor for his U.S. Army service during World War II, General Dynamics said Tuesday. Irene Hirano […] More
General Dynamics‘ Bath Iron Works subsidiary has completed hull, mechanical and electrical delivery of a second Zumwalt-class guided missile destroyer to the U.S. Navy. The Navy said Tuesday it accepted ownership of the future USS Michael Monsoor (DDG 1001) ship after a series of assessments and demonstrations of the vessel’s HM&E systems that include boat handling, anchoring and mooring, damage control, […] More
General Electric’s marine solutions business has completed a weight and noise attenuation testing between a carbon fiber-based gas turbine enclosure and steel module. GE said Monday test results showed that the lightweight composite-based module for the LM2500 marine gas turbine reduced noise by 60 percent and weight by approximately 2,500 kilograms compared with the steel enclosure. […] More
General Dynamics‘ Bath Iron Works subsidiary has completed builder’s trials on an Arleigh Burke-class guided missile destroyer for the U.S. Navy. The future USS Thomas Hudner (DDG 61) completed in-port and at-sea tests required to evaluate the vessel’s systems and delivery readiness, the Naval Sea Systems Command said Monday. Arleigh Burke-class warships are designed to incorporate the Aegis Baseline […] More
The U.S. Navy could issue a request for proposals within the next month for a multiyear contract to build at least 10 Arleigh Burke-class guided-missile destroyers (DDG-51), USNI News reported Tuesday. Capt. Casey Moton, DDG-51 program manager, told USNI News that the contract will run from fiscal 2018 to fiscal 2022 and will include options to accelerate […] More
Back to Top

Log In

Forgot password?

Forgot password?

Enter your account data and we will send you a link to reset your password.

Your password reset link appears to be invalid or expired.

Log in

Privacy Policy

To use social login you have to agree with the storage and handling of your data by this website.